Stone

Forum Replies Created

Viewing 15 posts - 181 through 195 (of 821 total)
  • Author
    Posts
  • August 10, 2010 at 8:43 am #23735

    jeeps are APOS :whistle:

    August 10, 2010 at 8:41 am #23734

    was right out side your house tonight …. well virtually (google earth) …. didn’t you see me …. your truck was in the drive :pcorn:

    August 10, 2010 at 8:37 am #23733

    [b]Brad Larsen wrote:[/b]
    [quote]Perverts[/quote]

    well rounded too :pcorn:

    August 10, 2010 at 8:32 am #23732

    [b]lild wrote:[/b]
    [quote]sweet lookin ride. but one thing some one forgot to put some stripes down the front of the newer one.
    detials, details.[/quote]

    least they didn’t forget them on the 65 😉

    August 10, 2010 at 8:11 am #23730

    when I do exterior body panels (rust patch) I butt weld a patch in …. takes some practice to master,(no warping) but once you do there is no other way …. lap welds are a rust trap :whistle: :pcorn: B)

    August 10, 2010 at 4:51 am #23713

    awesome bro :rock

    August 8, 2010 at 9:01 pm #23671

    I’ll tell him … no charge for the extra clear :rofl

    August 8, 2010 at 7:42 pm #23658

    here, I believe code would require it to be built out of metal or concrete, but if no ones looking :whistle:

    August 8, 2010 at 9:54 am #23647

    [b]Ben wrote:[/b]
    [quote]May be easiest to do it as a semi-down draft instead of a full down draft.[/quote]

    yup :unsure:

    August 8, 2010 at 9:52 am #23646

    [b]Ben wrote:[/b]
    [quote]If you had thinner, you could have over reduced it and applied several lighter coats from your gun (allowing necessary flash times between coats).[/quote]

    yup :unsure:

    August 8, 2010 at 9:23 am #23645

    if done right … i’ve seen plenty of failing adhesive jobs. and when it comes to structural integrity, I have my doubts :pcorn:

    August 8, 2010 at 5:16 am #23636

    It’ll bridge quite bad if you spray too dry :whistle: might need to sand it right off :unsure:

    August 6, 2010 at 10:56 pm #23597

    hmmmm $31.50/hr bet it’ll pay more 😉 B)

    August 6, 2010 at 10:41 pm #23594

    [b]Nexson wrote:[/b]
    [quote]Thanks Han!

    I did $220 on this one, plus he paid $70 to get it woodgrained, they did a great job on the woodgrain.[/quote]

    how long it take ? …. 5 hours? :pcorn:

    August 6, 2010 at 10:29 pm #23590

    may need to unsqueeze them after with a flathead for installation 😉

Viewing 15 posts - 181 through 195 (of 821 total)